USES
All surfaces must be cured, clean, sound and free of all contaminants such as form oils, release agents and mortar splashes.
Surface imperfections, misalignments and protrusions must be levelled and patched and completely flush to surrounding surfaces.
Metal, tie wire, etc. on surface must be removed or treated against corrosion. Prime substrate with Ultratex Prime. Ensure that it is cured completely and covers the substrate evenly. Patch with Ultratex texture after priming.